Pay Your Invoice Online
Sectors

Holt Road

Canham Consulting were asked by the District Council to provide emergency attendance and advice at the site of a vehicle impact.

We attended site within hours of the incident and provided specialist advice on the emergency temporary works and site clearance, enabling the building to be secured and the highway to be re-opened the same day.

Our team worked as the contract administrator for the duration of the contract to rebuild the shop and residential dwelling, producing drawings and detailed specifications to rebuild them in conjunction with statutory requirements.

Canham Consulting also acted as the CDM-Coordinator, working closely with the relevant contractor to comply with the Construction Design Management Regulations 2007.

Holt Road Services

Structural Survey

A Structural Survey is similar to a First Look Survey except that the engineer or surveyor will inspect and…

Building Regulations

Canham Consulting can provide a comprehensive service to our clients so that projects meet the approved documents…

Contract Administration

Our services include :   Contract PreparationDrafting and preparation of the contractAdministering the…

Scaffold & Temporary Works Designs

With the latest computer analysis software, combined with our professional experience and engineering judgement…

Impact & Flood

Our involvement is often started with a structural assessment shortly after the event, followed by reporting…

Holt Road Project Managers

Consultants to the Construction Industry

Registered Office: The Old School, School Lane, Thorpe St Andrew, NR7 0EP

Limited Company registered in England No. 2710417

© Canham Consulting 2020 | powered by empresa.